Commissioning of manufacturing equipment and specialized machinery, worldwide

We’ll get your system up and running, regardless of who installed it. From I/O checks and functional testing to safety and interface tests, all the way through system startup, acceptance testing, and support during the first days of production. If desired, we can perform virtual validation in advance so that errors are detected on the computer rather than on the system itself. Wherever your system is located—in Germany, Europe, Asia, or the Americas.

OEM Standards

ISO-certified

When the system is up but not running

Commissioning is the phase in which all the errors that no one had spotted before come to light. Signals are connected to the wrong terminal, an interlock engages too early, a drive rotates in the wrong direction, and the interface to the higher-level system isn’t reporting anything. Each of these issues is minor on its own, but collectively, they’re the reason why production launches fail. And unlike in the previous phases, there’s no more leeway here because the deadline is right at the end of the line.

Often, the system was installed by someone else. In such cases, the problem isn’t a lack of personnel, but a lack of control expertise: someone who can read the program, isolate errors while the system is live, and ensure that the system meets the cycle time. We take on precisely this responsibility, even if we weren’t involved in the installation.

What speeds things up is structure. We carry out commissioning in defined stages rather than trying to address multiple issues at once. And where it makes sense, we test the processes in advance using simulation, long before the first physical axis is moved.

Avoiding Equipment Downtime

From the installed technology
to the operational system

A commissioning process that goes quickly isn’t a fast commissioning process—it’s an orderly one. We work from the bottom up: first the signal level, then the safety functions and interfaces, followed by the ramp-up in interaction, and finally acceptance testing. Each stage is completed before the next one begins. This may sound slower, but it eliminates the need for duplicate searches—which is what costs the most time during the critical phase.

The end result is not just a fully operational system, but one that is ready for handover: complete with logs, CE-compliant documentation, and trained operating and maintenance personnel. Your point of contact remains the same from the first signal test through to final acceptance.

Our Commissioning Services

I/O Check and Functional Test

The foundation of any commissioning process. As long as the signal level isn’t correct, any troubleshooting further up the chain is a waste of time:

  • Check that the power is off before turning it on for the first time
  • I/O check and signal verification against the assignment in the program
  • Checking the Rotation Directions and End Positions
  • Configuration of Drives and Field Devices
  • PLC-side program synchronization and parameterization
  • Functional testing of individual functions prior to integrated operation
  • Identifying and Resolving Start-up Problems

Safety and Interface Tests

Security features and interfaces are the areas where future failures can develop if they are tested only superficially:

  • Verification of safety-related functions, including supporting documentation
  • Testing of emergency stop, safety door monitoring, light curtains, and enable devices
  • Testing PROFIsafe Communication and F-Peripherals
  • Testing of interfaces to robots, vision systems, RFID, and DMC scanners
  • Verification of the integration with MES and ERP, including message exchange
  • Interface testing in accordance with OEM specifications, such as for production IT systems
  • Verification of communication with upstream and downstream plant components

Plant Start-up and Cycle Time Optimization

Tested individual functions come together to form a system that produces:

  • Trial Operation and Ramp-Up in the Grid
  • Optimization of Processes and Interlocks
  • Cycle time optimization to achieve the required output
  • Monitoring and readjustment under actual load and with actual material
  • Analysis and Resolution of Start-up Issues
  • Fine-Tuning Robot Sequences and Motion Profiles

Acceptance Testing and Production Support

The system is running, and it should continue to run even after we leave:

  • Acceptance with a report and supporting documentation
  • Documentation as Part of the Handover
  • Orientation and Training for Operating and Maintenance Personnel
  • On-site support during the first days of production
  • Handover of Program Versions and System Documentation
  • Availability after acceptance: in the DACH region with a response time of less than 24 hours; internationally via remote access; and, if necessary, with on-site support

Is commissioning coming up?

Whether the system was installed by you, a third party, or us, we’ll handle the startup: a single cell, an entire line, at the plant next door, or on another continent.

Find errors before the system goes down

During virtual commissioning, your PLC program runs against a simulation model of the plant long before the mechanical components are even assembled. Sequence errors, incorrect interlocks, and collisions are detected on the computer, where corrections take only minutes rather than causing hours of plant downtime. To achieve this, we work with KUKA.Sim, Siemens NX, and the system’s digital twin.

The benefit lies less in the upfront effort than in the time spent on-site. Those who approach the actual plant with basic functions already validated can spend the commissioning phase fine-tuning rather than laying the groundwork—and this during a phase when every day on-site is costly. This is particularly evident in interlinked production lines, robotic cells with limited movement space, and systems being installed abroad.

Virtual commissioning does not replace actual commissioning. In reality, sensors, actuators, and materials never behave exactly as they do in the model. The two are intertwined, and that is exactly how we approach it.

Commissioning Right Where Your System Is Located

Many providers stop at the factory gate. We go the extra mile. If your system is being shipped abroad, we’ll commission it at the installation site—providing project management, planning, and material procurement, all from a single source if desired. Your point of contact remains the same, whether the line is in Germany or on another continent. We’ve carried out commissioning projects in Chile, India, and China, among other places.

We plan international assignments well in advance. Travel arrangements, visas, access regulations, on-site training, and spare parts supply are all part of the preparation process, ensuring that everything is in place at the site before the equipment arrives. Added to this are the varying requirements of the destination country, such as grid configuration and voltage levels, the language of documentation, and standards such as UL or CSA in North America.

Commissioning Worldwide

Real-World Projects from "
"

Commissioning of a Battery Cell Production Facility

Battery Manufacturing

Commissioning of a battery cell production line in China, including functional testing, ramp-up, and on-site handover.

High-Bay Warehouse Logistics

Commissioning in South America

Process Engineering

Commissioning of a plant in Chile, from signal testing through startup to training of the operating personnel.

What You'll Get From Us During Commissioning

Regardless of the structure

We commission systems that we did not install. You do not need a supplier who was previously involved in the project for the commissioning process.

Management expertise, not just personnel

Our commissioning engineers have a background in PLC programming. They read the program instead of just reporting symptoms.

Can be secured virtually

Upon request, we can review processes and movements in advance using simulations with KUKA.Sim, Siemens NX, and a digital twin. This allows us to identify collisions before the system is installed.

Global Deployment

Commissioning projects in Chile, India, and China, among other locations. We commission the plant on-site, working with the same point of contact.

Organized in stages

Signal level, safety and interfaces, ramp-up, acceptance testing. Each stage is completed, documented, and traceable, rather than relying on parallel troubleshooting.

Frequently Asked Questions About Commissioning

Yes, that happens quite often. We then begin by conducting an assessment, checking the installation against the documentation, and documenting any discrepancies before we power it on. We then take responsibility for the startup and ensuring that the system functions as promised, regardless of who installed it.

Yes. Our commissioning engineers have a background in programming and are able to familiarize themselves with existing code, including code structured according to an OEM standard. When we make changes, we document them in a traceable manner and return the code to you at the end.

In fixed stages. First, the power-off check; then the I/O check and testing of individual functions under power; followed by safety and interface tests; then the ramp-up in conjunction with cycle time optimization; and finally, acceptance testing, including documentation and staff training. Each stage is completed before the next one begins.

Your program runs against a simulation model before the system is actually set up. Run-time errors, interlock errors, and collisions are detected on the computer, where corrections take only a few minutes. The time spent on-site is reduced accordingly because the basic functions have already been validated. This does not replace the actual commissioning; it simply makes it significantly shorter.

The analysis then begins at the point where time is lost—that is, at processes, interlocks, travel times, and wait points. We optimize the sequence and parameter settings as much as the system’s mechanical design allows, and we clearly state when a requirement cannot be met without mechanical or design changes. You’ll receive this feedback early on, not just on the day of acceptance.

Our focus is on Germany and Europe, but we also travel farther afield. We have carried out commissioning projects in Chile, India, and China, among other places. For international assignments, we plan travel arrangements, visas, access regulations, and on-site logistics well in advance so that the on-site appointment is confirmed before the equipment arrives.

The system will run once it has been properly commissioned.

Your contact person

Ulrich Adelmann

Sales Manager

Do you have a project in the commissioning phase?

We're curious to see
which system inspires you.

Whether it’s a domestic launch, a commissioning on another continent, or a simulation-verified solution: Together, we’ll find the right path.