Relocation of a crankshaft production line from Poland to Germany

16 control systems. Two countries. As the general contractor. We relocated an existing crankshaft production line from a site in Poland to a German plant, adapted it to the new environment, and integrated it into an existing line there, assuming overall responsibility from design through commissioning.

Control Systems
0
Countries
0
GU
Overall Responsibility
Re-Use
Integration of Existing System Components

The Initial Situation

A German automaker wanted to relocate an existing crankshaft machining line from a facility in Poland to a plant in Germany and integrate it into an existing crankshaft production line there. The system to be relocated consisted of machining centers, gantry loaders, inspection stations, and interconnecting conveyors. The company was looking for a partner to assume overall responsibility for the control systems, from planning through to commissioning at the customer’s site.
A relocation involving the reuse of equipment is more challenging than a new construction project. The existing plant components had to be mechanically and control-system-wise compatible with the existing line at the destination site, where the layout and interlinking differed from those at the old site. In addition, the relocated and modified system required a new CE assessment, including complete documentation. Preserving the existing system while still integrating it in compliance with standards—that was the real challenge.

What We Have Taken On

We carried out the project as the general contractor and handled all control system work as a one-stop solution:

  • Project Management
  • Hardware Design and Electrical Design
  • Control Panel Construction
  • Software Development
  • Mechanical layout changes and adjustments
  • Assembly
  • Commissioning at the Customer’s Site

A total of 16 control systems were customized, integrated into the existing line, and commissioned.

Reuse and Integration into the Existing Product Line

The relocated system components—ranging from machining centers and gantry loaders to inspection stations and intermediate linkages—were not replaced but rather reused and integrated into the existing crankshaft production line. We adapted the control system so that the old and new equipment components work together as a single line.

Mechanical layout changes and adjustments

The layout at the destination site was different from that at the origin. We handled the necessary mechanical layout changes and adjustments to ensure that the relocated components would fit together in their new locations and integrate seamlessly into the existing production line.

CE Marking and Documentation

A relocated and modified system must be re-evaluated. We handled the CE certification process and prepared all the necessary documentation, ensuring that the integrated line could be put into operation in compliance with standards and with verifiable safety.

What Made This Project Special

A relocation involving the reuse of equipment is not a standard project. You’re not starting from scratch; instead, you inherit existing machines, gantry loaders, and test stations, and must integrate them into a new layout and an already operational production line. Every adjustment affects the sequence of operations and safety considerations, and ultimately, the entire line must meet CE conformity requirements as an integrated whole.
As the general contractor, we managed the project across two countries, handling everything from project management, hardware design, control panel construction, and software development to installation and commissioning at the customer’s site. For the automaker, this meant having a single point of contact for all control technology related to the relocation, rather than having to coordinate numerous contractors across national borders.

Technology Used

Your contact person

Ulrich Adelmann

Sales Manager

Are you planning to relocate your facility?

Whether it involves relocation across national borders, reusing existing plant components, or integrating the system into an existing production line, we assume full responsibility for the control systems—from planning through to commissioning at the customer’s site.