Relocation of a crankshaft production line from Poland to Germany
16 control systems. Two countries. As the general contractor. We relocated an existing crankshaft production line from a site in Poland to a German plant, adapted it to the new environment, and integrated it into an existing line there, assuming overall responsibility from design through commissioning.
The Initial Situation
What We Have Taken On
We carried out the project as the general contractor and handled all control system work as a one-stop solution:
- Project Management
- Hardware Design and Electrical Design
- Control Panel Construction
- Software Development
- Mechanical layout changes and adjustments
- Assembly
- Commissioning at the Customer’s Site
A total of 16 control systems were customized, integrated into the existing line, and commissioned.
Reuse and Integration into the Existing Product Line
Mechanical layout changes and adjustments
CE Marking and Documentation
What Made This Project Special
Technology Used
- Scope: Overall responsibility as general contractor
- 16 Controllers
- Hardware Design and Electrical Design
- Control Panel Construction
- Software Development
- Installation and Commissioning at the Customer's Site
- Reuse of Existing Equipment Components
- CE Marking and Documentation
Are you planning to relocate your facility?
Whether it involves relocation across national borders, reusing existing plant components, or integrating the system into an existing production line, we assume full responsibility for the control systems—from planning through to commissioning at the customer’s site.